Wednesday, October 17, 2012

Brown spots on the tees

Have you wondered what these spots are all about?  Many of the tees had dense stands of green kyllinga, a weedy sedge, that grows to form a dense mat.  Our control methods worked well and were timed just before overseeding so the brown spots are green as soon as possible.



Another recent rash of discolored turf can be found along the border of the driving range tee and near some greens.  In these locations we've sprayed a herbicide on some kikuyugrass.  We are not trying to rid the course of this turf type, but we are limiting the spread into the fairways, tees, and green surrounds.  Kikuyugrass can be an excellent playing surface, but it is very maintenance intensive.  The photo below has some of the treated kikuyu in the foreground with the final grading of the lower driving range tee in the background.  More on that later.


Tuesday, October 16, 2012

Collars get their first cut

Two weeks ago, we began renovating our paspalum collars.  Yesterday, the new stand of rye grass was cut for the first time.  We used a walking mower set at a half inch to do the job and the results were decent.  As expected, some of the grass was missed as the front roller pressed it down, but for the most part, the cut was good for the first time.


A little thin on closer inspection
Looks good from a distance

Jose Luis mowing #3 



Immediately after we mowed the collars, we sprayed the surface with a growth regulator.  This product will stop the seedlings from reaching for the sky and redirect that energy to the roots and tillers to thicken and strengthen the stand of grass.  The same product was sprayed on the greens this morning to improve density and reduce growth, which both will help to improve speed.

The greens have been mowed multiple times in the last two weeks, with the first cut coming just four days after aerification.  The mowers were sharpened after this morning's tour, the second sharpening since we aerified.  The next step is dropping the height for the last time and drying out the greens now that they have healed and all bentgrass seed has germinated.


Wednesday, October 10, 2012

Bunker Construction

I feel like I'm falling behind on the blog even though the last post was just a few days ago.  There is so much happening on the course that I can't keep up with the pics and descriptions, but it's nice to have plenty of work to talk about.

One of the major projects of last week was the addition of a greenside bunker on #2.  This bunker is part of the Master Plan designed by architect, Cary Bickler.  We only played a small part in the bunker's  construction handling sod removal, irrigation re-routing, and the final tie in with sod, seed and the green surrounds.  The bunker is closed for grow-in right now, but will open as soon as the sod is rooted into the soil, less than a week away.

Here are a few photos of the project.  I think you'll how this bunker plays.  The sand we used sets up really well and doesn't require much time to settle and mature.  Remember, this is the first installment of the "new" Master Plan.  Can you imagine improvements of this kind throughout an already excellent layout?  This is definitely something to be excited about.








Sunday, October 7, 2012

Maintenance week updates

In five days with the course all to ourselves, the maintenance staff worked long hours, took short breaks, and seamlessly moved from one job to the next.  I was proud of the crew for handling the hot weather and the intense work load.  The physical nature of our tasks last week left us all sore and tired but nobody called in sick or showed up late.  Monday we punched all the greens, Tuesday we focused on the collars until the sod cutter broke down.  New jobs went up on the board and within fifteen minutes, every staff member was out to their next assignment.  Really impressive in terms of efficiency.  When players returned to the course Saturday, I would have loved to have everything neat and trimmed, but we did not have time for that.  Next week we will do some fall cleaning.  Here is a list of our accomplishments during five closed days:


  • All greens were aerified, fertilized, and sanded
  • All collares were stripped, leveled, aerified, seeded, and topdressed
  • All fairways were aerified.
  • All tees were verticut and seeded, paspalum tees were also aerified
  • A new bunker was installed on #2 and we handled the sod work
  • Driving range tee, driving range floor, and chipping area were aerified
  • Sand removed from #2 fairway bunker was added to the practice bunkers
  • All fairways and primary rough were fertilized 
The greens were aerified using a quad tine setup on our Ryan aerifiers.  This means more holes and closer spacing.  This is a win-win for you and me.  I get more surface disruption and more thatch removed and you get faster recovery.  Below is a photo from Friday, four days after aerification and just a few hours after our first mowing.



This close up of the collars shows the seedlings beginning to emerge.  I took this picture of #9 on Saturday, four days after we finished the process.  The next shot was taken Sunday afternoon.  Ryegrass germinates and grows very quickly and you can see a difference in just a couple of hours.



The greens will get their second cut tomorrow afternoon.  The collars will fill in quickly and will be opened for play as soon as they can handle the traffic.  Thank you for your patience and for the soft foot steps the last couple of days.  Everything is coming along very nicely.  

Wednesday, October 3, 2012

Collares

The job board today had everyone on the same job, "collares."  We all went out to continue the stripping, aerification, seeding, and top dressing of the collars.  We finished 6 holes on Monday before our sod cutter sheared a pin.  We picked up a rental in the evening and put it to work at 7:00 am.  That one broke around 12:30 today and we went out and got another.  Just a couple of hiccups along the way, but the project has gone well.  Here are a few pictures from this detailed process:

We started the day on #6 green.  These guys are not just standing around, they must wait until all the sod is cut before
they pull it up or the sod cutter will not stay level.  We learned that yesterday.


There is a ton of hand work with this job.  We are not trying to rid the collars of paspalum, not yet.  We are working to level the surface to improve playability, improve surface drainage, and get direct seed-to-soil contact for our ryegrass.  After the sod was stripped, three staff members fined tuned the surface with flat-edged shovels.


After the sod removal and the initial grading, Rafael used the aerifier to punch some holes and open up the surface.  Our Assistant Superintendent, Ramiro, directed this work and sometimes had an area aerified twice or three times if it was too high.  Then it was back to hand grading the surface.  The photo upper right shows the seeding process which used a lot of seed.  The light brown portion has just been seeded with ryegrass.

This photo shows Abel topdressing following the seeding.  A light sanding buried the seed and made
nice home to start germination.  Frequent light waterings will have the seed popping in just a few days.


Tuesday, October 2, 2012

Aerification Photos (and a few more)

I find it easiest to share our fall maintenance work in a slew of photos, instead of a bunch of text.  In two closed days, we've achieved weeks worth of work.  It's Tuesday evening and I guarantee that the entire staff will be sleeping well tonight unless they are too sore to do so.  You have a very hard working staff to be proud of and this is just a small example of their work during the most important week of the year.


We started with green aerification bright and early on #9.

After the greens are clean, here comes some fertilizer.
Next we put down some sand.  Abel and Santiago did a great job, perfect application with just the right amount.



In other news, Elidio was busy punching the fairways,
completing 5 holes in one day.
A tree company was out to trim the palms and it is
a huge improvement.
This mess is our new bunker on #2, which now looks great just 48 hours after they broke ground.

Finally the big one, next to our aerified, fertilized, top dressed, and seeded green, we are stripping
the collars.  6 holes were finished today and more tomorrow.


The last two pics deserve detailed posts of their own, and you will get them.  I will update you tomorrow on the results of the collar work which required the help of every single staff member.  Their efforts will produce long-term improvements in the playability and health of the golf course.  Hopefully,  I will supply enough donuts in the morning and Gatorade in the afternoon to keep them motivated.  So far, I am absolutely thrilled.

Tuesday, September 25, 2012

Collar Renovation

I don't think I've ever had a more important topic to share with the membership.  This project is going to be very aggressive and will take some understanding from you, the golfer.  Next week, the course will be closed for fall maintenance.  One of the many projects planned during this period is the overseeding of the paspalum collars.

This year, we will use a sod cutter to remove all the leaf tissue and some thatch of the paspalum, exposing the underlying soil.  This will allow the seed to be sown directly to the soil.  We also will correct the height difference between the paspalum and the greens to improve playability and surface drainage.

The photo to the left is an example of previous attempts which was aerification followed by a vibratory plate, or wacker.  This worked in some locations, but our new strategy will be much faster and more effective.  However, it will be a bit shocking for the first week or so.



This method of overseeding comes with proven results.  The seed gets direct contact with the soil and germinates quickly to produce a good stand of ryegrass for the winter months.  As temperatures warm in the spring, the paspalum's stolons and rhizomes will begin to grow, overtaking the ryegrass and giving us our summer turf.  Sounds good, right?  First, it will get a little ugly.

To the right is our trial on the nursery.  We sod cut at a very shallow depth to remove the top, but preserve the stolons and rhizomes.  We then veritcut, topdressed with sand, leveled the surface, and mixed in the seed.  Just four days later the seed was beginning to show(lower pic).

The course reopens on Saturday and some collars will be seeded just two days prior to opening.  We ask that you minimize the traffic on the collars, do not stand on them and do not play on them.  You get relief from these locations and a little understanding will go a long way.  The result will be improved playability, healthier greens and collars, and a beautiful dark ring of ryegrass that will border the greens all the way to spring.  I'll have many more updates on this renovation including some video clips of the actual process.  I want everyone to know about this so it's not a surprise when you return to the course.  Tell your friends and playing partners and do not hesitate to contact me with any questions or concerns.